Coming next Building compliance
EICR software for small electrical contractors
Not in Kerova yet. Coming to Kerova. We're building this with firms that do the work. Tell us how you do it and get early access.
Electrical installation condition reports, filled in on the phone on site, circuit by circuit, with every C1 and C2 turned into a quote before you've left the building.
What the paperwork usually involves
An EICR records the condition of an existing installation against BS 7671, the IET Wiring Regulations, with the method set out in the IET's Guidance Note 3 on inspection and testing. For most small firms the report is three things stuck together:
- The report itself: who asked for it and why, the extent of the inspection and any limits agreed with the client, the supply characteristics and earthing arrangements, and the overall result: satisfactory or unsatisfactory.
- Observations: each one written up and given a classification code. C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended) and FI (further investigation) are the codes everyone knows, and the codes decide the overall result.
- The schedule of inspections and the schedule of test results: a line for every circuit on every board, with the protective device, the cable, and the readings taken: continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation.
Landlords in England need an inspection at least every five years under the private rented sector electrical safety regulations of 2020, and commercial clients, insurers and letting agents all ask for the report. The work is quick to do; the write-up is what eats the evening, and a C2 that waits a week for a quote is a job that often goes to someone else.
General terms only: we name the standards but don't quote them. Work to the current edition and your own procedures.
What Kerova already does that carries straight across
Kerova is live today for fire and security firms. These parts of it would work the same way for eicr and electrical testing:
- Circuit-by-circuit registers: Kerova already keeps a register of every item on a site with its own readings and result (every appliance on a PAT record, every fitting on an emergency lighting certificate). A board and its circuits is the same idea.
- Last visit filled in: Five years on, the boards, circuits and devices from the last report are already there. You check what's changed instead of writing it all out again.
- Observations into quotes: A failed item in Kerova becomes a repair with its own photo and a quote the office can send the same day. A C1 or C2 would work the same way.
- Signed on site, no signal needed: Fill it in in a basement with no signal; the client signs on the phone and it all uploads when you're back above ground.
- A QR check on every report: Anyone with the report, a letting agent or an insurer, can scan the code and see that it's genuine and hasn't been changed.
- Reminders and the client portal: The next inspection date goes in when the report is signed, the client is reminded, and every report for every property is in their portal. Invoices go to Xero.
What we'd need to build: the EICR and the electrical installation certificate layouts, the schedule of test results with its own checks, the observation codes deciding the result, and the minor works certificate. Tell us how you do it now and which bits slow you down.
Early access
Tell us how you do it, and get it first.
Five minutes. We read every one, and the trades with the most firms asking get built first.
Questions
Is it available now?
Not yet. EICRs are coming next: we're building them with electrical firms first, through early access. In the meantime, fire alarms, intruder alarms, CCTV, access control, emergency lighting, extinguishers, fire doors, AOVs and PAT testing are live today.
Will it cover EICs and minor works too?
That's the plan, as the same firms write all three. Tell us on the form which ones you do most.
What does early access mean?
You tell us how you do the job now, we show you what we've built as it's built, and you use it on your own sites before it's open to everyone. No card, and you can stop whenever you like.
What will it cost?
Kerova's plans include every discipline it has today, from £99 a month (see pricing). We'll say how eicr and electrical testing is priced before anyone pays for it.
Live in Kerova now, on the same buildings
- PAT testing records in Kerova (live now)
- Emergency lighting certificates (live now)
- Fire alarm certificates (live now)
Also coming next
- Sprinkler systems (inspection and testing logs)
- Gas and kitchen fire suppression
- Dry and wet risers
- Water hygiene and legionella (temperature and flushing logs)
- Gates, barriers and roller shutters (safety inspections)
- Lightning protection testing
- Ductwork cleaning (TR19)
- Fire risk assessments
- Building compliance in Kerova: everything, live and coming
Something else? Tell us what you'd like Kerova to do.