Coming next Building compliance
Fire risk assessment software for assessors
Not in Kerova yet. Coming to Kerova. We're building this with firms that do the work. Tell us how you do it and get early access.
Fire risk assessments written up on site, room by room with photos, and an action plan the client can actually track, next to every fire safety certificate for the building.
What the paperwork usually involves
Fire risk assessments for most non-domestic premises and the common parts of blocks of flats are required in England and Wales by the Regulatory Reform (Fire Safety) Order 2005, with more for some residential buildings under the Fire Safety (England) Regulations 2022. Many assessors follow PAS 79-1 (non-housing) or PAS 79-2 (housing) for the method and layout. An assessment usually covers:
- The premises and the people: the building, its use, who's in it and who's especially at risk.
- The hazards and the precautions: ignition and fuel sources; and the protection in place: detection and alarm, emergency lighting, escape routes, fire doors, compartmentation, extinguishers, signs, and the management of all of it, including whether it's being tested and serviced.
- The findings and the action plan: what needs doing, how urgently, and who's responsible.
- The review date: when it should be looked at again, and what would trigger a review sooner.
The hard part for the client is the action plan: it lands as a PDF and gets lost. The hard part for the assessor is the write-up, with dozens of photos sorted by hand after the visit.
General terms only: we name the standards but don't quote them. Work to the current edition and your own procedures.
What Kerova already does that carries straight across
Kerova is live today for fire and security firms. These parts of it would work the same way for fire risk assessments:
- Every fire certificate for the building, in one place: A building's fire alarm, emergency lighting, extinguisher, fire door and AOV certificates are already in Kerova for the client to see. The assessment would sit with them, and you'd see what's been serviced and when.
- Photos with arrows: Take a photo, draw an arrow on the problem and save it, as engineers already do on fire door inspections.
- An action plan that's tracked: Kerova already turns failed items into repairs the client sees and approves in their portal. Actions would work the same way, with who and by when.
- Done on site, signed on site: No signal needed; it uploads later.
- A QR check: Anyone given the assessment can check it's the genuine, current version.
- Review reminders: The review date goes in when it's signed, and the client is reminded.
What we'd need to build: the assessment layout, findings with photos, the action plan with priorities and owners, and review dates. Tell us how you write yours up now and which method you follow.
Early access
Tell us how you do it, and get it first.
Five minutes. We read every one, and the trades with the most firms asking get built first.
Questions
Is it available now?
Not yet. Fire risk assessments are coming next, built with assessors through early access. In the meantime, fire alarms, intruder alarms, CCTV, access control, emergency lighting, extinguishers, fire doors, AOVs and PAT testing are live today.
Would the client see the action plan?
Yes, that's the point: each action in their portal, with who's doing it and by when, next to their certificates.
What does early access mean?
You tell us how you do the job now, we show you what we've built as it's built, and you use it on your own sites before it's open to everyone. No card, and you can stop whenever you like.
What will it cost?
Kerova's plans include every discipline it has today, from £99 a month (see pricing). We'll say how fire risk assessments is priced before anyone pays for it.
Live in Kerova now, on the same buildings
- Fire alarm certificates (live now)
- Emergency lighting certificates (live now)
- Fire door inspections (live now)
- Fire extinguisher service records (live now)
Also coming next
- Electrical installation condition reports (EICR) and electrical testing
- Sprinkler systems (inspection and testing logs)
- Gas and kitchen fire suppression
- Dry and wet risers
- Water hygiene and legionella (temperature and flushing logs)
- Gates, barriers and roller shutters (safety inspections)
- Lightning protection testing
- Ductwork cleaning (TR19)
- Building compliance in Kerova: everything, live and coming
Something else? Tell us what you'd like Kerova to do.