Coming next Building compliance
Gate, barrier and roller shutter safety inspection software
Not in Kerova yet. Coming to Kerova. We're building this with firms that do the work. Tell us how you do it and get early access.
Safety inspections for powered gates, barriers, roller shutters and industrial doors, on the phone: every safety device checked, force results recorded, and anything unsafe made safe and quoted the same day.
What the paperwork usually involves
Powered gates, barriers, shutters and doors are kept safe to BS EN 12453 (safety in use of power operated doors and gates), with BS EN 12604 for the mechanical side, and the DHF's code of practice for powered gates, TS 011, is widely used for the inspection itself. The paperwork usually covers:
- The gate or door: type, drive, controls, where it is and who uses it.
- The mechanical checks: the structure, hinges or rollers, the track, the stops, the springs and the manual release.
- The safety devices: photocells, safety edges, the controls, warning lights and signs, each checked and the result written down.
- Force testing: where it's needed, measured with a force tester at the points the method sets, with the readings on the record.
- The result and the risk: safe, or not, what was done to make it safe, and the work needed.
An unsafe powered gate can kill, so landlords, managing agents and businesses want proof the inspection was done, and they want any danger put right quickly. The firms doing the work are often also the ones fitting the access control on the same gates.
General terms only: we name the standards but don't quote them. Work to the current edition and your own procedures.
What Kerova already does that carries straight across
Kerova is live today for fire and security firms. These parts of it would work the same way for gates, barriers and shutters:
- Every gate and door on its own line: Kerova already keeps every door on its own line in access control and fire door records. Gates, barriers and shutters fit the same register, each with its own result and next date.
- Photos on every check: Mark up a photo of the fault with an arrow before you save it, as engineers already do on fire door inspections.
- Unsafe into a quote, today: A failed safety device becomes a repair with the photo and a quote, sent before you leave and approved in the client's portal.
- Signed on site: The client signs the inspection on the phone, with no signal needed.
- A QR check on every record: A managing agent or insurer can check it's genuine and unaltered.
- Reminders and Xero: The next inspection is reminded; invoices go to Xero.
What we'd need to build: the gate, barrier, shutter and door register, the safety device checks, force test results, and the made-safe record. Tell us which you inspect most.
Early access
Tell us how you do it, and get it first.
Five minutes. We read every one, and the trades with the most firms asking get built first.
Questions
Is it available now?
Not yet. Gates, barriers and shutters are coming next, built with the firms that inspect them through early access. The free checklist is ready to print today. In the meantime, fire alarms, intruder alarms, CCTV, access control, emergency lighting, extinguishers, fire doors, AOVs and PAT testing are live today.
Will it record force test readings?
That's the plan: each test point and its reading. The checklist template has space for them, without printing any limits.
What does early access mean?
You tell us how you do the job now, we show you what we've built as it's built, and you use it on your own sites before it's open to everyone. No card, and you can stop whenever you like.
What will it cost?
Kerova's plans include every discipline it has today, from £99 a month (see pricing). We'll say how gates, barriers and shutters is priced before anyone pays for it.
Live in Kerova now, on the same buildings
- Access control certificates (live now)
- CCTV certificates (live now)
- Intruder alarm certificates (live now)
- Free gate and barrier safety inspection checklist (PDF)
Also coming next
- Electrical installation condition reports (EICR) and electrical testing
- Sprinkler systems (inspection and testing logs)
- Gas and kitchen fire suppression
- Dry and wet risers
- Water hygiene and legionella (temperature and flushing logs)
- Lightning protection testing
- Ductwork cleaning (TR19)
- Fire risk assessments
- Building compliance in Kerova: everything, live and coming
Something else? Tell us what you'd like Kerova to do.