Free template · PDF · BS 8214

Fire door inspection checklist

Go round the building door by door. Page 1 is the door schedule, with one line per door and its result. Page 2 is the checklist for one door: print one for each door you inspect.

2 pages, A4 (print page 2 once per door) · 58 KB · Free, no sign-up, no email address · Print it as many times as you like

What it's for, and how often

  • Communal fire doors in blocks of flats over 11 m: Every three months, under the Fire Safety (England) Regulations 2022.
  • Flat entrance doors in those blocks: Every twelve months, as far as you can get access.
  • Other fire doors: As the fire risk assessment says. Every six months is common; busy doors may need checking more often.

What's on it

  • Door schedule: ref, location, rating, result, notes
  • One-door checklist: label, leaf and frame, glazing, gaps (measured in mm), strips and seals, hinges, closer, latch, hold-open, signage, apertures
  • Result: Pass, Fail or Advisory, with what needs doing

It's our own layout, made to be filled in by hand on site. It works to BS 8214 but doesn't quote it, so keep a copy of the current edition to hand.

Or do it on your phone insteadDoing the fire door inspection? Do it on your phone with Kerova's fire door inspection app, part of its fire and security software. In Kerova the fire door paperwork is filled in on the engineer's phone, works with no signal, is signed by the client on site and can be checked by anyone with the QR code on it. Last visit's details are filled in for you.

Try it free for a month

More free templates

Ready when you are

Fill it in on the phone, not on a clipboard.

Kerova does the logbooks, checklists and certificates for all nine disciplines, and reminds you when the next one is due.

First month free · no card · we help you set up